Les Sables D’Olonne – Here we Are!

DSC_0464DSC_0465DSC_0466

DSC_0458DSC_0457DSC_0456

With three marvellous days in Paris under our belts, we braved the motorways of France and drove our hire car to Les Sables D’Olonne, 5 hours away. Our hire car was a Renault Scenic, not too bad despite having the steering wheel on the wrong side – the manual was also a bit of a challenge with everything round the other way.

It was a lovely drive through the French countryside to the coast. We quickly checked into our room and saw a message from Leanne that La Mischief had just been put in the water. Missed its launch by an hour or so – bummer.

But it was great to see her in the flesh. We hopped on board and had a quick look round as there were workers crawling all over it. Then we went and had a drink or three on Ooroo 1 – Mike and Leanne’s new Lagoon 450. How weird is that – two couples from Perth getting new Lagoon’s parked up in France, one behind the other.

First Pictures of La Mischief

La Mischief is now out of the factory and into the yard at Sailing Atlantic Services (SAS). Here they offload the boat from truck at launch site and do the following

Mast preparation
Launching
Mast stepping
Complete setting-up of the boat and her equipment
– Installation of pulpits, pushpits, stanchions and life lines
– Electrical connections
– Sails and rigging
– Installation of anchor kit and mooring kit (if supplied)
– Engine start up / check
Filling of water tanks and fuel tanks (200l)
Complete cleaning of boat